Cluster Design and the End-to-End Data Path · Part 3 of 7

Act 3 — Frontend and Border: The Ethernet Tiers

Building the model…

The same cluster with all four networks drawn: compute rails, frontend, storage and out-of-band, each with its own switches and its own failure domain.

The Ethernet side of the cluster is two tiers of the same switch, doing two different jobs.

The frontend leaf pair attaches the servers. Each node's dual-port 200 GbE adapter lands one port on each of two MLAG-paired leaves, bonded with LACP so the pair is active/active — up to 400 Gb/s per server aggregate across flows, with any single flow limited to one 200 Gb/s member. On a 64-cage 800 Gb/s switch, 72 server links at 200 Gb/s consume 18 cages in four-way breakout:

PurposeCagesModeLogical ports
Server downlinks184 × 200G breakout72 × 200G
MLAG peer link2800G2 × 800G
Uplinks to border4800G4 × 800G (two to each border leaf)
Used / free24 / 40
PurposeServer downlinks
Cages18
Mode4 × 200G breakout
Logical ports72 × 200G
PurposeMLAG peer link
Cages2
Mode800G
Logical ports2 × 800G
PurposeUplinks to border
Cages4
Mode800G
Logical ports4 × 800G (two to each border leaf)
PurposeUsed / free
Cages24 / 40
Mode
Logical ports

The oversubscription number, and why it is fine. 72 servers × 400 Gb/s = 28.8 Tb/s of host-facing capacity against 6.4 Tb/s of uplink — 4.5:1 north-south. In an enterprise fabric that would be aggressive. Here it is healthy, because east-west collective traffic — the demanding, synchronous, latency-critical traffic — does not use this fabric at all. What crosses these uplinks is provisioning, control plane, telemetry, tenant internet traffic and (in a converged design) storage. If storage or tenant north-south grows, the ratio is a purchasing decision, not a redesign: every additional pair of 800 Gb/s uplinks per leaf moves it, and there are forty free cages to take them.

The overlay. EVPN-VXLAN with an anycast gateway on both leaves and a shared anycast VTEP address per MLAG pair. Tenant virtual networks stretch across the pair; the underlay is eBGP unnumbered on every fabric link with a per-switch private ASN and BFD on every session. The automation platform provisions VNIs and virtual networks per tenant — nothing in the overlay should be hand-configured, because hand-configured overlay state is how two tenants end up sharing a VNI.

The border leaf pair is the service edge. It is the only tier that talks to the security edge, the gateway nodes, and the management network, and it exists so that the frontend leaves never have to.

NeighbourLinks per border leaf
Frontend leaf pair2 × 800G to each = 4 × 800G
MLAG peer2 × 800G
Gateway / NAT service nodes2 × 400G (one cage, broken out)
Edge firewalls2 × 400G
Out-of-band switchesone 100G to each management switch
NeighbourFrontend leaf pair
Links per border leaf2 × 800G to each = 4 × 800G
NeighbourMLAG peer
Links per border leaf2 × 800G
NeighbourGateway / NAT service nodes
Links per border leaf2 × 400G (one cage, broken out)
NeighbourEdge firewalls
Links per border leaf2 × 400G
NeighbourOut-of-band switches
Links per border leafone 100G to each management switch

That is roughly fifteen cages used out of sixty-four. The headroom is deliberate: a second compute pod's frontend pair, a dedicated storage tier, a data-centre interconnect to a second site, or an exchange port all land on the border tier without touching anything else.

One warning about the management uplinks. A 100 GbE management switch's host lanes are NRZ, while a modern 800 Gb/s cage is PAM4. "Break out a 400G module into 100G" is not automatically a supported path between them — the optics have to explicitly provide compatible signalling and gearboxing at both ends. Reserve the cages in the budget, qualify the exact optical pair with the vendor, and do not let a plausible-sounding substitution into the bill of materials unqualified. This is the single most common late-stage surprise in a design like this.